TENNESSEE CHAPTER I.A.E.I. SPRING MEETING

April 27th and 28th, 2018

 Registration begins at 7:30 a.m.

Meeting begins at 8:30 a.m. on Friday and 7:45 a.m. on Saturday

 The DoubleTree Hotel

1850 Old Fort Parkway

Murfreesboro, TN 37129

 For hotel reservations call:

615-895-5555 Mon – Fri 8 – 5

1-888-488-3517 anytime

Use Group Code: IAE

Or Click Below

double-tree-Logo

 The room block reservation cut off is Friday April 6, 2018.

You must make your reservations prior to this date to get our discount.

Room rate is 99.00 + tax per night single or double.

Room rate includes 1 free breakfast buffet. Additional breakfast coupons may be purchased during check-in for only $5 more.

Register Now

IAEI Members and Exhibitors $75.00

Non-Members $125.00

Full-time Students or Saturday Only Class $25.00

Lunch on Friday Is Included.

Hospitality Room will open at 3:00 p.m. on Thursday April 26th

This meeting will be all day on Friday 27th and

a half day on Saturday the 28th.

CEU Certificates will be issued for each day.

For questions contact Greg Taylor at 865-755-2542

or Rusty Thompson at 865-273-3517

Download Meeting Registration Form

Advertisements

East TN Division Spring Meeting


The East TN Division IAEI presents:

2017 NEC Analysis of Changes

March 16, 2018

Walters State Community College Lyceum

500 S. Davy Crockett Parkway

Morristown, TN


Hundreds of revisions in the 2017 NEC will have a direct impact on residential, commercial, and industrial installations. Added NEC articles broaden the Code’s coverage of alternate energy sources and emerging technologies. Stay informed about vital changes and expansions with this accurate, authoritative program from the IAEI. Gain the latest knowledge about Code-compliant electrical design, installation, and inspection with this.

New 2017 Articles

  • Large-Scale Photovoltaic (PV) Electric Power Production Facility (New Article 691) covers systems that produce at least 5 megawatts (MW) of power, or enough to power 800+ U.S. homes.
  • Energy Storage Systems (New Article 706) governs ESS installation, disconnection, shutdown, and safety labeling.
  • Stand-Alone Systems (New Article 710) covers power production sources that are not connected to the grid, including PV and wind-powered systems.
  • Direct Current Microgrids (New Article 712) concerns independent energy distribution networks that allow the utilization of power from dc sources to direct-current loads. Microgrids are on the rise worldwide.

Other revisions to the 2017 NEC protect the public and workers from deadly hazards, including:

  • new labeling, such as detailed arc flash hazard warning on equipment, helps workers and supervisors assess electrical risks.
  • new minimum space clearances for equipment installation clarify the safeguards needed to protect installers and maintainers.
  • fixed Resistance and Electrode Industrial Process Heating Equipment (New Article 425) presents needed regulations for industry.
  • revised provisions for AFCI and GFCI protection improve electrical and fire safety in homes.

Continuing Education Credit: 6 hours

Learning Outcomes:

After taking this course, the participant should be able to

  • Understand Article 100 definition changes and requirements for electrical installations.
  • Describe code-wide changes.
  • Define changes to the proper use and identification of grounded conductors.
  • Describe changes to outside branch circuits and feeders.
  • Identify code changes related to services and overcurrent protection.

 

Cost: $25 – members

            $50 – nonmembers

 Registration at the door begins at 7:30 a.m.

Online registration with credit card processing available below

Training will be from 8:30 – 4:30.

IAEI CEU’s will be issued for 6 hours of training.
Drinks and snacks will be provided for breaks. Lunch is on your own.
Register Now
 
For more information contact:
Greg Taylor (865) 755 – 2542
Rusty Thompson (865) 740 – 7093
Bill Manis (423) 306 – 5518